Port Situation

See the status of motorboats at the terminal: announced, confirmed and sailed.

Click here

Pronóstico de Tutiempo.net
Item Description
Port area 23 hectares
Logistics area 30 hectares
Equipment Lifts of up to 18 MT
Reach Stacker
4 m3 bucket loaders
18 m3 dump trucks
Direct loading system for bulk minerals and direct unloading for clean grains.
Docking positions Position 1: Maximum LOA 200 meters, 9.5 meters maximum operational draft SW
Position 2: Maximum LOA 80 meters, 7 meters maximum operational draft SW
Customs System Primary customs area, deposit available, deposit for international logistical support.
Certifications BASC
ISO 9001
ISO 14001
OHSAS 18001.
  • Bulk handling direct loading system
  • Palletized cargo
  • General cargo
  • Coal
  • Unloading bulk
  • Yard area: Four yards (14,185 m2, 12,363 m2, 7,591 m2 and 7,290 m2). A total of 41,430 m2.
  • Storage warehouse: Three storage warehouses, two covered warehouses with areas of 630 m2 each and one semi-covered with an area of 1,539 m2.
  • Four vertical silos with a total capacity of 15,000 tons for grains.
  • Two mobile hoppers with a capacity of 20 m3 each.
  • FAM ship loader, capacity of 500 tons/hour.
  • Three horizontal warehouses for storage of grains, with a capacity of 8,000 tons each.
  • Mechanized system for loading dirty bulk and receiving clean grains.



  • Port Manager: Jorge Halblaub

  • E-mail: comercial@compas.com.co

  • PBX: +(57 5) 672 42 50 

  • Address: Km 4 Vía Tolú – Coveñas 
    Carretera Troncal del Caribe 
    Santiago de Tolú - Colombia.

write us here